{"id":4492,"date":"2019-12-19T10:31:58","date_gmt":"2019-12-19T09:31:58","guid":{"rendered":"http:\/\/52.29.152.78\/process-examples\/interconnected-production-planning\/"},"modified":"2024-05-03T09:28:46","modified_gmt":"2024-05-03T08:28:46","slug":"interconnected-production-planning","status":"publish","type":"page","link":"https:\/\/selfbits.de\/en\/process-examples\/interconnected-production-planning\/","title":{"rendered":"Interconnected production planning"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Interconnected production planning<\/h1>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Until now<\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Without interconnection<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\"Produktionsplanung\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Creation of the production plan<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Production planning begins with the disposition calculation in ERP (e.g. SAP, ABAS or Sage). Current and incoming customer orders are offset against stocks and minimum stocks. This results in internal and external business orders. Lot sizes, deadlines and disposition procedures control the prioritization and release of orders.<\/p>\n

Detailed planning for the production orders is created in table programs such as e.g. Microsoft\u00ae Excel. Depending on the status of the IT infrastructure, the current plans are synchronized with a central network storage or saved locally on the computers in production planning. Calculation formulas or columns may have been created or someone with VBA knowledge programmed macros for easier creation.<\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t

Possible problem areas<\/h4>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t